Project Details

Project Details
Agency Poulsbo
Project # 6691001
Project Title Noll Road Improvements
WSDOT Region Olympic
Legislative District 023
Congressional District 06
Project Description Roadway, illumination, sidewalk, and shared use path improvements in various configurations through the corridor per the corridor plan. Roundabout at the new intersection of Johnson Road, a non-motorized crossing at SR305, and potential intersection traffic control at the Noll Road / SR 305 intersection. Stormwater conveyance improvements to Liberty Bay outfall. Utility relocation/replacement will occur as needed. New water/sewer mains will be installed in the new roadway segment. Construct in three stages: Stage 1 South-NE Johnson Way to I/S of Noll Road/Storhoff Road NE. Stage 2 Center–I/S of Noll Road/Storhoff Road NE to I/S of Noll Road/NE Mesford Road. Stage 3 North–I/S of Noll Road/NE Mesford Road to Maranatha Lane & Lincoln Road.
Project Type Right of Way
Project Funding
Fund ProgramAmount
STP Regional$2,200,000.00
Federal Total$2,200,000.00
CWA (WSDOT)$550,000.00
State Total$550,000.00
Other$993,353.00
Total Project Cost (see NOTE below)$3,743,353.00
Project Milestones
Preliminary Engineering Authorized 06-02-2015
Environmental Approved 10-12-2023
Right of Way Certified 09-18-2026
Construction Authorized
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.