Project Description Widen the existing roadway to a five-lane roadway consisting of four through lanes and a two way left turn lane. Includes paved shouders, concrete curb and gutters, and concrete sidewalk. Improve the intersection of Canyon Road East and 72nd Street East, including reconstruction of the existing traffic signal system.
Project Type Improvement
Project Funding
Fund ProgramAmount
LP Federal - Additional OA$1,000,000.00
STP Regional$3,800,000.00
Federal Total$4,800,000.00
Other$5,188,900.00
Total Project Cost (see NOTE below)$9,988,900.00
Project Milestones
Preliminary Engineering Authorized 07-18-2013
Environmental Approved 11-03-2021
Right of Way Certified 10-08-2021
Construction Authorized 11-08-2021
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.