Project Details

Project Details
Agency Columbia Co.
Project # D071004
Project Title Starbuck Bridge Replacement
WSDOT Region South Central
Legislative District 016
Congressional District 05
Project Description Construct replacement bridge at existing location and remove existing structure. Construction will be staged to build one-half of bridge at a time.
Project Type Bridge,Design,Right of Way
Project Funding
Fund ProgramAmount
Bridge$531,157.00
Federal Total$531,157.00
Other$6,205,658.00
Total Project Cost (see NOTE below)$6,736,815.00
Project Milestones
Preliminary Engineering Authorized 04-12-2013
Environmental Approved 04-25-2025
Right of Way Certified 09-09-2026
Construction Authorized 09-16-2026
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.