Project Details
Project Details
Agency
Pierce Co.
Project #
3170003
Project Title
Canyon Rd Northerly Extension
WSDOT Region
Olympic
Legislative District
029
Congressional District
09
Project Description
Construct new roadway with two through lanes in each direction. To include replacing of existing bridge over Puyallup River at 66 Ave E. new traffic signals at major I/S and new RR grade separation over BNSF tracks. Roadside improvements to include sidewalks, paved shoulder or wider outside lanes to accommadate non motorized use. SCOPE CHANGE: 8/02 Split into two projects PCO-70 (this project, 52nd to 70th) and PCO-70A new project (Pioneer Way E to 52nd which will include the BNSF grade separation).
Project Type
Design
Project Funding
Fund Program
Amount
STP Regional
$1,250,000.00
Federal Total
$1,250,000.00
Other
$911,000.00
Total Project Cost (see NOTE below)
$2,161,000.00
Project Milestones
Preliminary Engineering Authorized
04-24-2000
Environmental Approved
Right of Way Certified
Construction Authorized
Completed
Roads
Satellite
JavaScript must be enabled in order for you to use this map.
However, it seems JavaScript is either disabled or not supported by your browser. To view this map, enable JavaScript by changing your browser options, and then try again.
LEGEND:
Design
Right of Way
Construction
Complete
Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.