Agency Pierce Co.
Project # 3170003
Project Title Canyon Rd Northerly Extension
WSDOT Region Olympic
Legislative District 029
Congressional District 09
Project Description Construct new roadway with two through lanes in each direction. To include replacing of existing bridge over Puyallup River at 66 Ave E. new traffic signals at major I/S and new RR grade separation over BNSF tracks. Roadside improvements to include sidewalks, paved shoulder or wider outside lanes to accommadate non motorized use. SCOPE CHANGE: 8/02 Split into two projects PCO-70 (this project, 52nd to 70th) and PCO-70A new project (Pioneer Way E to 52nd which will include the BNSF grade separation).
Project Type Design
Project Funding
Fund ProgramAmount
STP Regional$1,250,000.00
Federal Total$1,250,000.00
Other$911,000.00
Total Project Cost (see NOTE below)$2,161,000.00
Project Milestones
Preliminary Engineering Authorized 04-24-2000
Environmental Approved
Right of Way Certified
Construction Authorized
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.