Project Details

Project Details
Agency College Place
Project # 7212001
Project Title SE 8th Street Sidewalk
WSDOT Region South Central
Legislative District 016
Congressional District 05
Project Description Installation of pedestrian sidewalk on south side of SE 8th Street between College and Birch Avenue. Includes ADA ramp installs at College/8th and Birch/8th.
Project Type Transportation Enhancement
Project Funding
Fund ProgramAmount
TAP$224,224.00
Federal Total$224,224.00
Other$65,994.00
Total Project Cost (see NOTE below)$290,218.00
Project Milestones
Preliminary Engineering Authorized
Environmental Approved 04-17-2025
Right of Way Certified
Construction Authorized 08-14-2025
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.