Project Details

Project Details
Agency Wahkiakum Co.
Project # 2035058
Project Title E. Fork Deep River - Phase 1
WSDOT Region Southwest
Legislative District 019
Congressional District 03
Project Description Remove 5 undersized culverts and flap gates in the dike separating E. Fork from the Deep River mainstem and replace with 3-bay, 40' wide concrete box culvert. Includes channel excavations, floodplain benches, and removal of hydraulic constrictions.
Project Type Safety
Project Funding
Fund ProgramAmount
Project Milestones
Preliminary Engineering Authorized
Environmental Approved
Right of Way Certified 09-15-2026
Construction Authorized 09-21-2026
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.