Project Details
Project Details
Agency
Kitsap Co.
Project #
2018065
Project Title
Duncan Creek
WSDOT Region
Olympic
Legislative District
026
Congressional District
06
Project Description
Replace existing stream pipeline system under Colchester Dr with a 3-sided bottomless box culvert. Includes approx. 40-ft of new channel, replace existing stormwater pipe system and outfall, and install large woody material and riparian plantings.
Project Type
Design
Project Funding
Fund Program
Amount
PROTECT
$490,000.00
Federal Total
$490,000.00
Other
$123,000.00
Total Project Cost (see NOTE below)
$613,000.00
Project Milestones
Preliminary Engineering Authorized
06-12-2025
Environmental Approved
Right of Way Certified
Construction Authorized
Completed
Roads
Satellite
JavaScript must be enabled in order for you to use this map.
However, it seems JavaScript is either disabled or not supported by your browser. To view this map, enable JavaScript by changing your browser options, and then try again.
LEGEND:
Design
Right of Way
Construction
Complete
Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.