Agency La Center
Project # SR23020
Project Title 4th Street and Highland Road Traffic Signal
WSDOT Region Southwest
Legislative District 020
Congressional District 03
Project Description Pedestrian countdown signal, reduce curb radii, leading pedestrian intervals, full traffic signal, pedestrian signal phase separated from left turn phase, rectangular rapid flashing beacon (RRFB), speed feedback signs, chool/playground 20 mph speed zone (flashing beacons/signage), pedestrian scale crossing illumination, ADA curb ramps, audible pedestrian signal
Project Type Improvement
Project Funding
Fund ProgramAmount
Safe Routes to School$966,196.00
State Total$966,196.00
Other$20,000.00
Total Project Cost (see NOTE below)$986,196.00
Project Milestones
Preliminary Engineering Authorized
Environmental Approved 03-05-2024
Right of Way Certified
Construction Authorized 06-26-2024
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.