Project Details

Project Details
Agency Lakewood
Project # SR23022
Project Title 112th St SW - Lake Louise School Sidewalk
WSDOT Region Olympic
Legislative District 028
Congressional District 10
Project Description School/playground 20 mph speed zone (flashing beacons/signage), lower the speed limit, pedestrian scale segment lighting/illumination, ADA curb ramps, audible pedestrian signal, bicycle wayfinding signs/markings, bike lanes, sidewalk with curb and gutter, rectangular rapid flashing beacons (RRFB), and speed management treatments.
Project Type Transportation Enhancement
Project Funding
Fund ProgramAmount
Safe Routes to School$1,142,720.00
State Total$1,142,720.00
Other$182,158.00
Total Project Cost (see NOTE below)$1,324,878.00
Project Milestones
Preliminary Engineering Authorized 10-11-2024
Environmental Approved 07-31-2025
Right of Way Certified
Construction Authorized 12-10-2025
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.