Project Details

Project Details
Agency Chehalis
Project # 5672004
Project Title Chamber Way/BNSF Bridge Replacement
WSDOT Region Southwest
Legislative District 020
Congressional District 03
Project Description New bridge carrying two lanes of traffic in each direction with a sidewalk along the south. Span is over BNSF right-of-way. Proposed span consists of two spans of 130 feet and one span of 115 feet for a total length of 375 feet. The proposed bridge would be constructed with pre-stressed concrete girders with a cast-in place concrete deck.
Project Type
Project Funding
Fund ProgramAmount
State Legislature Earmarks$215,000.00
State Total$215,000.00
Other$0.00
Total Project Cost (see NOTE below)$215,000.00
Project Milestones
Preliminary Engineering Authorized 11-06-2024
Environmental Approved
Right of Way Certified
Construction Authorized
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.