Project Details

Project Details
Agency Longview
Project # 6758004
Project Title Columbia Heights Road
WSDOT Region Southwest
Legislative District 019
Congressional District 03
Project Description Widen roadway, pave, curb and gutter, sidewalk, paved shoulders, guardrail, retaining walls, illumination, storm drainage, striping, signing, and replacement of existing water and sewer lines (water/sewer with non-federal funds).
Project Type Improvement,Other
Project Funding
Fund ProgramAmount
Congress Directed Spending$7,500,000.00
STP Regional$2,745,586.00
Federal Total$10,245,586.00
Move Ahead Washington$2,000,000.00
State Total$2,000,000.00
Other$7,185,022.00
Total Project Cost (see NOTE below)$19,430,608.00
Project Milestones
Preliminary Engineering Authorized 09-26-2023
Environmental Approved 04-13-2026
Right of Way Certified 06-29-2026
Construction Authorized 08-26-2026
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.