Agency Shelton
Project # 000S728
Project Title Railroad Crossings Closures
WSDOT Region Olympic
Legislative District 035
Congressional District 06
Project Description At 3 locations (Olympic Hwy South, S. 7th St, and Hulbert Rd E.) - removal of existing railroad track and panels, associated equipment, warning devices, and railroad cabinets. Improve sight lines, provide delineation of pathways for pedestrians and cyclists, and remove roadside hazards. Restoration will include repaving SR-3, reestablishing vegetation, and installing channelization and signing.
Project Type Design,Safety
Project Funding
Fund ProgramAmount
Railroad$679,000.00
Federal Total$679,000.00
Other$18,770.00
Total Project Cost (see NOTE below)$697,770.00
Project Milestones
Preliminary Engineering Authorized 09-08-2025
Environmental Approved 11-03-2025
Right of Way Certified 06-09-2026
Construction Authorized 09-22-2026
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.