Project Details

Project Details
Agency Woodland
Project # 6876001
Project Title W Scott Avenue RR Crossing
WSDOT Region Southwest
Legislative District 020
Congressional District 03
Project Description Provide sidewalks and ramps with truncated domes on the north and south side of W. Scott Avenue and pavement preservation within the project limits. Includes replacing existing flashing lights on the gate assembly with LEDs and installing concrete rail panels on the north side. Install curbing to prevent traffic from bypassing gate arm.
Project Type Safety
Project Funding
Fund ProgramAmount
Railroad$794,410.00
Federal Total$794,410.00
Other$10,000.00
Total Project Cost (see NOTE below)$804,410.00
Project Milestones
Preliminary Engineering Authorized
Environmental Approved 11-02-2021
Right of Way Certified
Construction Authorized 05-12-2022
Completed
LEGEND:  Design  Right of Way  Construction  Complete  Delayed
NOTE: Total project cost only reflects the current costs for the project milestones authorized above. For example, if construction is not authorized, the total project cost shown does not include costs to construct.